| Other than tweaks to the cabinetry, and the wires for the island light fixture, the kitchen is relatively complete. |
Friday, January 20, 2012
Testing, smoking, and hoping
Thursday, January 19, 2012
Ovens, stairs, and a sconce
| The double-oven has finally arrived! It's being installed today, and should be ready for a test tomorrow. |
| Sometimes, it's those little elements, such as a wall sconce, that takes more effort to select than the kitchen appliances. |
Saturday, January 14, 2012
Wednesday, January 11, 2012
Kitchen, hearth progress, other homey details
While inspecting progress on my house's renovation, tunes from an iPod purred throughout the in-ceiling speakers. Everyday, the place feels more like home.
Other details include:
| Excluding a breaker upgrade from 30 to 50 amps, the cooktop, down-draft, and dishwasher are installed! I've already taken an induction-capable pot for testing. |
| Lighting fixture is nearly installed over the island. After James has a chance to weight in on hanging height, the excess wire will be trimmed and tucked. |
| Fridge in place, but its height required some minor modification to the cabinets above. Also, where you see a white ice chest, the double ovens are to be installed... after they arrive in 2 weeks. |
| The hearth in the living room is halfway there! This section is drying so that it can better support the next layer of stone. Once finished, the wood-burning stove takes stage. |
| Hung, but not yet wired, the last ceiling fan, which is in the master bedroom. |
- Moisture barrier installed on nearly all the floors, including the stairs.
- Paint details throughout the entire house.
- Moisture barrier and exterior for the chimney nearly finished.
- Radiant heat pad ready to install, and then we tile the family room and entryway!
Monday, January 9, 2012
Kitchen, chimney, speakers, nerd
| Installing (replacing) the above-counter cabinets in the kitchen's corner. |
| Dishwasher installed. |
| Cooktop is nearly installed, and the down-draft (that strip at the top) is in. |
| In-ceiling (or wall) speakers are installed around the house (with iPod/iPhone/iPad control of the receiver/amplifier). |
| Chimney for the family room in mid-repair. |
| Interior shot of the new front doors, with James being a photo-sabotaging nerd! |
Friday, January 6, 2012
Appliances, front doors, stoves, etc
| New front doors |
| Building a new hearth in the living room for the wood-burning stove. The mortar was still wet for the slate base when I took this photo. |
| Had to replace much of the chimney due to rot. |
| New KitchenAid fridge. We plan on installing a deep freezer in the utility room, so we went with a basic refrigerator that fits the existing cabinets. |
| Dishwasher |
| One of the in-ceiling speakers for surround sound in the family room. |
| Access tunnels to the septic tank are resized, and on the 'completed' list. |
Thursday, January 5, 2012
Doors and mores
Front doors are nearly installed. Stoves are being finished. 7.1 surround sound, and "zone 2" speakers installed. Kitchen appliances are arriving tomorrow! The exterminator arrives soon, and the contractors are hacking out any termite damage as it's discovered (such as the chimney and front door stop).