|
Ovens installed! As instructed, I ran both ovens at 500F on the convection roast setting for an hour. As a result, I inadvertently tested all the smoke detectors in the entire house. Then I got to test all the ceiling fans... |
|
Other than tweaks to the cabinetry, and the wires for the island light fixture, the kitchen is relatively complete. |
I can finally see the end to this phase of the renovation. The only major item remaining is cork flooring for the bedrooms, and tile flooring for the family room and entryway. After I move in, phase II kicks off (which includes the solar panel array, re-shingling the roof, patio repair, and driveway modifications).
No comments:
Post a Comment