While inspecting progress on my house's renovation, tunes from an iPod purred throughout the in-ceiling speakers. Everyday, the place feels more like home.
|
Excluding a breaker upgrade from 30 to 50 amps, the cooktop, down-draft, and dishwasher are installed! I've already taken an induction-capable pot for testing. |
|
Lighting fixture is nearly installed over the island. After James has a chance to weight in on hanging height, the excess wire will be trimmed and tucked. |
|
Fridge in place, but its height required some minor modification to the cabinets above. Also, where you see a white ice chest, the double ovens are to be installed... after they arrive in 2 weeks. |
|
The hearth in the living room is halfway there! This section is drying so that it can better support the next layer of stone. Once finished, the wood-burning stove takes stage. |
|
Hung, but not yet wired, the last ceiling fan, which is in the master bedroom. |
Other details include:
- Moisture barrier installed on nearly all the floors, including the stairs.
- Paint details throughout the entire house.
- Moisture barrier and exterior for the chimney nearly finished.
- Radiant heat pad ready to install, and then we tile the family room and entryway!
No comments:
Post a Comment