One side of our master shower is plumbed. |
Pending a few parts (and one minor decision), the guest bathroom downstairs is nearly finished. |
Lastly, the bar stools are assembled and in place. |
One side of our master shower is plumbed. |
Pending a few parts (and one minor decision), the guest bathroom downstairs is nearly finished. |
Lastly, the bar stools are assembled and in place. |
James has a special skill at finding those special touches. |
Corner shelf assembled for kitchen near the entry from the living room. |
Flowering vetch that runs up the hill between our house and the road. Look closely, and you'll spot James on the deck. |
The new 1hp well pump arrived (hope UPS didn't beat it to death, based on the box's appearance) to replace the gonked out 3/4hp pump. |
Our lovely refrigerator has a limited freezer capacity, so we brought in a big chest freezer. |
My fingers are a tad numb from assembling the chair legs, but it was worth it to finally have a place to sit. |
Pull up a chair, I'm nearly ready to fix dinner! |
Looks almost black in these pictures, but the wood stain is actually chocolate, which is my attempt to tie in the ceiling fan blades. |