Friday, December 2, 2011

Up, down, black, light

Orange paint is up. Now to tone it down. I was going for sunrise, I got school bus.
Work on a critical element, the septic system, is concluding at last. From day 1, we puzzled over the tank's location. Now access tunnels ensure the lids might be reached so the tank can be flushed.
According to the septic system subcontractor, we are the proud owners of a quality concrete tank with a 2,500 gallon capacity. It will need to be revisited and flushed every 5 years.

Attempts to get electricity connect from PG&E is slow going. Our address is not in their database. They admit the number on the SmartMeter matches, but don't know why... So they will take 2 to 3 days to send a person out to the house to verify it's there.

Lastly, received the replacement glass cover for the stairwell light. However, it also was broken, and was the incorrect part. Someone mistakenly picked OVA EWW 31 off the shelf and shipped it, instead of JES EWW 31.